Skip to content
Customize Consent Preferences

We use cookies to help you navigate efficiently and perform certain functions. You will find detailed information about all cookies under each consent category below.

The cookies that are categorized as "Necessary" are stored on your browser as they are essential for enabling the basic functionalities of the site. ... 

Always Active

Necessary cookies are required to enable the basic features of this site, such as providing secure log-in or adjusting your consent preferences. These cookies do not store any personally identifiable data.

Functional cookies help perform certain functionalities like sharing the content of the website on social media platforms, collecting feedback, and other third-party features.

No cookies to display.

Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics such as the number of visitors, bounce rate, traffic source, etc.

No cookies to display.

Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.

No cookies to display.

Advertisement cookies are used to provide visitors with customized advertisements based on the pages you visited previously and to analyze the effectiveness of the ad campaigns.

No cookies to display.

ventillation systems
since 1983
ventilation systems
since 1983

Reichstag, Berlin (D)

In 1999 we started works in Reichstag, the seat of the German Parliament. KMW Engineering was responsible for a new ventilation system for the plenary chamber and the general ventilation system for other rooms (including those of political fractions). In the steel and glass dome of Reichstag we installed a special exhaust air processing unit with a heat recovery system. The dome itself weights over 1200 tonnes, forms a ceiling for the Parliament chamber, and is one of the most well-known landmarks of Berlin and Germany.

The delivery technical standard:

  • a special unit in the exhaust funnel of the Parliament dome, with the flow rate of 90,000 m3/h;
  • a block of inlet units and dampers supporting natural ventilation for the main debating chamber;
  • a block of units and panel duct for air conditioning and ventilation of political fractions rooms. 

The Reichstag refurbishment was conducted in accordance with the concept of Sir Norman Foster, following the assumption of the original design from one hundred years ago. This concept involved use of natural ventilation in the Parliament dispute chamber. The design consisted of a system of air processing units supporting the natural flow. The air processing units had to be installed in historical rooms, and the new exhaust cone was fitted into the building dome. Contractors conducting works in Reichstag invited KMW Engineering to cooperate on design and execution of this difficult task. KMW prepared the design, and delivered and installed the whole system functionally described by the design office Kühn Bauer Partner.

The design of the German Parliament building, Reichstag, was very modern, yet for 40 years it lacked the dome. In 1884 the design engineers constructed a natural ventilation system, with air flowing through ventilation shafts supplying fresh air to the debating chamber. The system ensured effective ventilation supported with fans powered by steam machines, which were replaced with electrical drives at the beginning of the 20th century. The air was removed through the dome. After the Second World War and two fires, the building was used as a congress centre.  After reunion of Germany, the original concept was followed, with a natural ventilation system constructed in the main chamber. The new, modern dome has numerous functions.

The glass dome provides natural light for the Debating Chamber. A spiral walkway was installed inside of the dome, allowing visitors to climb to the top of the dome and view the Berlin panorama. The most important component is the ventilation funnel, in which the exhaust and smoke removal system with heat recovery was installed.